With GST highly unlikely to see the light of the day on April 1, 2016, the Make in India dream appears to be under threat at this stage
The facility, which will produce to 80,000 units per year initially and then scale it up to 150,000 units in the next phase, to act as export hub for other Andean & Central American countries
The company, which already has a defence manufacturing facility in Bengaluru and a R&D set up at Mumbai, will create an integrated digital design-to-manufacturing facility at Vemagal
As per the contract, CG will provide maintenance and repair services to French firm ERDF's 4,500 high power transformers
Two companies will partner for the construction of naval ships - including frigates, destroyers and other specialised vessels for the Gulf Cooperation Council (GCC) region
The investment, in its existing two-wheeler and three-wheeler plants, will be mainly for development of new products and for capacity expansion
The company will set up a 3000-tonne reactive dyes facility. It also plans to set up a sulphate of potash (SOP) plant with 10,000 tonnes per year capacity
This new development will enable the company to service the growing demand of synthetic food colours globally
Acquisition of Gloucester, in which the Mumbai-based Kabra Extrusion Technology holds a minority stake, will strengthen Davis-Standard's global aftermarket and blown film capabilities
This facility will predominantly manufacture the Mold-Masters' automotive and large part focused hot runner system - Fusion G2
With the new plant, the company aims to increase the production capacity from 2 million pieces per day to 2.5 million units per day
Mahindra Group is also looking to raise the investment - which will be spent for setting up a Mahindra Research Valley (MRV), test track for MRV & automotive plant - to Rs 4,000 crores by 2022
By implementing integrated process optimisation software, Asian companies, faced with cost pressure and productivity issues, can drive efficiencies and maximise returns
The first virtual centre, spread across 5 IITs, for collaborative research will focus on the thematic areas of research in advance bio-fuel technologies
The solar systems, set up for newly finished Badarpur-Faridabad line, are built on the roofs of the stations and depot and are expected to generate 1.9 MW of solar power
The 100 MW project will be a part of the 'Inox Wind Park' of 200 MW capacity at Lahori, one of many such 'Wind Parks' being developed by Inox across the country
Mahindra Telephonics was the first defence aerospace JV company to address the growing need for defence electronics & RF systems in India with a particular focus on airborne radars
Gujarat State Fertilizers and Chemicals is also planning to set up a new partially oriented yarn (POY) line and to install high speed spinning chips plant of 30,000 MTPA capacity at Kosamba
As per the contract, Wabag and Muhibbah Engineering will develop an effluent treatment plant (ETP) for Petronas' Refinery and Petrochemicals Integrated Development (RAPID) project in Malaysia
Husain, an expert in power and automation who has been with ABB for more than 30 years, will report to CEO Ulrich Spiesshofer