Kishenganga: India may face 5% power prodn shortfall annually

Image
Press Trust of India New Delhi
Last Updated : Jan 12 2014 | 10:40 AM IST
India is likely to suffer a marginal shortfall in power production from the upcoming Kishenganga hydro-electric project in Jammu and Kashmir in the wake of the International Court of Arbitration's verdict to release fixed quantity of water to Pakistan.
The Hague-based Court had decided in December last year that India should release a minimum flow of nine cumecs (cubic metres per second) into Kishenganga river (known as Neelum river in Pakistan) for environmental reasons.
"This would affect power generation by five per cent annually," a source in the Ministry of Water Resources told PTI.
The project is designed to generate power by diverting water from a dam site on Kishenganga river to the Bonar Nallah, a tributary of Jhelum river, through a system of tunnels, with the water powering turbines having a capacity of 330 MW.
According to sources, releasing nine cumecs of water, as per orders, may come in the way of diverting water for generating power during the four "lean months", where water flow dips to a low.
While water flow is 1000 cumces during flood seasons and adequate from March to September, it falls to less than 30 cumces between November and February.
Water flow in these four months varies from 30 cumecs to four cumecs. With the court's direction, India cannot divert water for power production on days when the water flow drops to less than nine cumecs, the sources said.
In turn, this would hit the production of 330 MW, with the losses estimated to be five per cent in a year.
In a major relief for India last year, the ICA rejected Pakistan's objections and upheld New Delhi's right to divert water from the Kishenganga river for power generation in Jammu and Kashmir.
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

First Published: Jan 12 2014 | 10:40 AM IST

Next Story