Tata Power Renewable Energy, NTPC join hands to set up 200 MW green project

The Firm and Dispatchable Renewable Energy (FDRE) project, spread across multiple locations in India, is set to be completed within 24 months and is expected to generate approximately 1,300 mn units

Tata power
These ongoing projects are expected to be completed in phases over the next 6 to 24 months in a staggered manner. | File Image
Press Trust of India New Delhi
2 min read Last Updated : Apr 14 2025 | 4:20 PM IST

Tata Power Renewable Energy Ltd (TPREL) has signed a power purchase agreement (PPA) with NTPC Ltd to develop a 200 MW clean power project.

"With this project, its total renewable utility capacity has reached 10.9 GW," TPREL, a Tata Power subsidiary, said in a statement on Monday.

The Firm and Dispatchable Renewable Energy (FDRE) project, spread across multiple locations in India, is set to be completed within 24 months and is expected to generate approximately 1,300 million units (MUs) of electricity annually, TPREL said.

The project will mitigate over 1 million tonnes of carbon dioxide emissions per year. The project was won by TPREL based on competitive bidding and would consist of solar, wind and BESS (battery energy storage system) technologies.

A key feature of this initiative is the commitment to a 4-hour peak power supply, ensuring at least 90 per cent availability during peak demand hours to support the growing energy needs of distribution companies.

This collaboration reinforces TPREL's position as a leader in India's renewable energy sector with hybrid and complex renewable projects, consisting of solar, wind and battery storage.

With this project, TPREL's total renewable utility capacity has reached 10.9 GW. Currently, 5.5 GW of this capacity is operational, comprising 4.5 GW of solar and 1 GW of wind energy. Additionally, 5.4 GW is under various stages of implementation, evenly split between 2.7 GW of solar and 2.7 GW of wind projects.

These ongoing projects are expected to be completed in phases over the next 6 to 24 months in a staggered manner.

(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

Topics :Tata Powerrenewable energyPower renewable energyIndia's renewable energy

First Published: Apr 14 2025 | 4:20 PM IST

Next Story