Explore Business Standard
IRB Infrastructure on Monday posted a 9 per cent year-on-year rise in its toll revenue to Rs 682 crore in October 2025. Revenues from the toll collection business stood at Rs 624 crore in the same month last year, IRB said in an exchange filing. Revenue includes toll collection from two of its sponsored InvITs, i.e., IRB InvIT Fund (Public InvIT) and IRB Infrastructure Trust (Private InvIT), IRB Infra said. Of its 22 BOT and ToT assets, IRB MP Expressway in Maharashtra contributed the major share of Rs 150.5 crore to the total revenue collection in October, up from Rs 142.6 crore contribution in October 2024. With Rs 73.8 crore, IRB Golconda Expressway (Hyderabad ORR) was the second largest contributor to the revenues in October 2025, up from 67 crore last year. Contribution of IRB Ahmedabad Vadodara Super Express Tollway rose to Rs 73 crore in October 2025 from Rs 66.2 crore in October 2024, it said. Amitabh Murarka, Dy. CEO of IRB Infra said, "After a strong performance in the
The government has reduced the toll rates up to 50 per cent for the sections of National Highways that have structures like tunnels, bridges, flyovers or elevated stretches, a move which will lower travelling cost for motorists. User charges at fee plazas on National Highways are collected as per NH Fee Rules, 2008. The Ministry of Road Transport and Highways has made amendment to 2008 rules and notified a new method or formula for calculating toll charges. "The rate of fee for use of a section of national highway comprising of structure or structures shall be calculated by adding ten times the length of structure or structures to the length of the section of national highway excluding the length of structure or structures, or five times the total length of section of national highway, whichever is lesser," said the notification dated July 2, 2025. 'Structure' means an independent bridge, tunnel or flyover or elevated highway. To explain the new toll charges, the ministry has cited
The trucks from Karnataka are expected to go off the road from midnight on Monday as the truckers affiliated to the Federation of Karnataka State Lorry Owners and Agents Association (FOKSLOAA) are set to begin their indefinite strike against fuel price hike and harassment at toll plazas. According to the FOKSLOAA's honorary general secretary Somasundaram Balan, the federation is the biggest transport body in Karnataka with nearly six lakh trucks enrolled with it and comprises 196 truckers' bodies. There is no change in our programme. We will go ahead with our strike because the Karnataka government has not called us for any meeting yet. Our demands are against fuel price hike and toll issues, Balan told PTI. In a letter to its members, FOKSLOAA gave a call for an indefinite suspension of transport operations in Karnataka for resolution of critical and long-standing issues faced by the road transport sector in the state. Steep hike in Value Added Taxes (VAT) on diesel, resulted in a
State-owned NHAI will develop a 121-km-long Guwahati Ring Road on build-operate-toll mode at a total cost of Rs 5,729 crore, an official statement said on Thursday. The statement further said the concession period of the contract is 30 years, including the construction period of four years. "Providing impetus to the project, the state government of Assam will bear 50 per cent of land cost, provide exemption from royalty on aggregates and state portion of GST contributing about Rs. 1,270 crore," it said, adding that thus, the gross project cost is about Rs 7,000 crore. The Guwahati Ring Road project will have three sections which include 56 km long 4-lane Access-Controlled Northern Guwahati Bypass, widening of the existing 8 km bypass on NH 27 from four lanes to six lanes, and improvement of existing 58 km long bypass on NH 27. Notably, a 3 km long major bridge over river Brahmaputra will also be constructed as a part of the project. The Guwahati Ring Road will provide seamless ...
Commuters on national highways and expressways will need to pay more for their road journeys, as the National Highways Authority of India (NHAI) has increased toll charges by an average of 4 to 5 per cent on highway sections across the country. The revised toll charges for motorists on national highways across the country have come into effect from Tuesday, a senior highways ministry official told PTI. NHAI notifies toll rate hikes for all the national highways and expressways separately. According to him, the change in toll fee is part of an annual exercise to revise the rates that are linked to the changes in the wholesale price index-based inflation. Every year, it is implemented from April 1. There are around 855 user fee plazas on the national highway network on which user fee is levied as per National Highways Fee (Determination of Rates and Collection) Rules, 2008. Out of these, around 675 are public-funded fee plazas and 180 are concessionaire-operated toll plazas. The rev
Cracking down on irregularities in toll collection, state-owned NHAI has barred 14 toll collection agencies for irregular activities, following a probe after Uttar Pradesh STF unearthed a fraud, according to an official statement. NHAI has served show-cause notices to defaulting agencies. Based on the FIR, 13 user fee-collecting agencies have also been debarred for a period of two years. Besides, 12.55 lakh refunds were made in 2024 for faulty toll collections on National Highways, Parliament was informed on Thursday. According to the statement, the 14 agencies debarred by NHAI include AK Construction, Alok Buildtech Pvt Ltd, Anil Kumar Shukla, Ashish Agarwal, Innovision Ltd, MB Construction, Maa Narmada Traders, RK Jain Infra Projects, SPC Infrastructure Pvt Ltd, T Suryanarayana Reddy, Vanshika Construction, Westwell Iron & Steel Pvt Ltd, Bhola Nath Rajpati Shukla and Shiva Buildtech Pvt Ltd. More than Rs 2 crore have been levied so far on the user fee collecting agencies for ...
IRB Infrastructure on Monday posted a 20 per cent year-on-year rise in toll revenue to Rs 559.7 crore in January. Revenues from the toll collection business stood at Rs 466.8 crore in the same month last year, IRB said in an exchange filing. Of its 17 tolls, the IRB MP Expressway in Maharashtra contributed the major share of Rs 155.2 crore to the total revenue collection in January, followed by IRB Ahmedabad-Vadodara Super Express Tollway, which contributed Rs 69.9 crore, it said. The company collected Rs 33.1 crore in toll revenue from CG Tollway (Chittorgarh to Gulabpura, NH 79). Amitabh Murarka, Dy CEO of the company, said, "We continued strong growth in January... This momentum is expected to continue, driven by recent Budget allocations aimed at boosting consumption and tourism while enhancing transportation infrastructure, which, in turn, will increase traffic on our assets in 12 states." IRB is India's first integrated infrastructure player in the highways segment. It is t