NTPC gears up to meet rising power demand; generation up 23%

State-run power giant NTPC on Monday said that it has geared up to meet rising power demand and recorded electricity generation growth of 23 per cent over the previous year.

NTPC
Press Trust of India New Delhi
2 min read Last Updated : Aug 30 2021 | 2:23 PM IST

State-run power giant NTPC on Monday said that it has geared up to meet rising power demand and recorded electricity generation growth of 23 per cent over the previous year.

The country is witnessing a sharp increase in power demand and NTPC is making all efforts for meeting demand as per the grid requirement, it statement said.

NTPC has geared up to meet the increasing demand and the generation from NTPC group stations has registered a 23 per cent growth compared to the previous year, it stated.

Under flexible utilisation of coal policy, NTPC is arranging coal at the stations where the stock position is critical.

Further, it said that it is continuously coordinating with Coal India and Railways for augmenting coal supply at critical stations and diverting rakes wherever required.

It is also augmenting 2.7 Lakh MT import coal left out from the contracts placed earlier.

Darlipalli Unit 2 (800 MW) was put in operation, and commercial operation of the unit is being done with effect from September 1-09-2021.

The plant is a pit-head station, and the coal is being fed from captive mine of NTPC (Dulanga), it said.

It is increasing coal production from all captive mines of NTPC, it added.

During peak hours, approximately 7 GW of gas capacity is on bar against 3 GW last week.

It has been observed that the states are not scheduling from gas stations, but are drawing from the grid. Further, for meeting the peak requirement, Power System Operation Corporation (POSOCO) is scheduling the gas stations under Reserves Regulation Ancillary Services (RRAS).

To have adequate planning by the generators, and to ensure adequate arrangement for gas, it is advised that the states may schedule power at least for a week.

RRAS is to restore the frequency level at desired level and to relieve the congestion in the transmission network. RRAS shall support both regulation up and regulation down service.

(Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)

*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

Topics :NTPCpower demand forecastelectricity demandsPower generation

First Published: Aug 30 2021 | 2:23 PM IST

Next Story