HBL Engineering up 4% on winning ₹54-cr order from West Central Railway

HBL Engineering shares advanced 4.3 per cent on Tuesday, August 12, 2025, and logged an intra-day high at ₹713.4 per share on BSE, after winning ₹54.12 crore order

Stock market
Photo: Shutterstock
SI Reporter Mumbai
2 min read Last Updated : Aug 12 2025 | 10:44 AM IST
HBL Engineering shares advanced 4.3 per cent on Tuesday, August 12, 2025, and logged an intra-day high at ₹713.4 per share on BSE. 
 
At 10:29 AM, HBL Engineering's share price was trading 3.73 per cent higher at ₹709.05 per share. In comparison, the Sensex was 0.14 per cent higher at 80,716.65.

Why were HBL Engineering shares in demand?

The buying interest on the counter came after the company received a letter of acceptance from the West Central Railway. 
 
Under the contract, HBL Engineering will survey, design, supply, install, test, and commission trackside KAVACH equipment at stations and level crossing (LC) gates—including setting up towers and related works—needed for KAVACH in the Kota-Ruthiyai section and Sogaria-Kota "C" section (166 route kilometers) of the Kota division, West Central Railway. 
 
The total value of the project is estimated at ₹54.12 crore, and has to be completed within 700 days. 
 
"We would like to inform the stakeholders that the West Central Railway has issued letter of acceptance to HBL for Survey, design, supply, installation, testing and commissioning of trackside KAVACH equipment at stations/LC Gates locations, including erection of towers and associated works required for KAVACH in Kota-Ruthiyai section and Sogaria-Kota "C" Section (166 Rkm) of Kota division of West Central Railway," the filing read.   Check List of Q1 results today

HBL Engineering Q1 results

In Q1, HBL Engineering reported a consolidated profit after tax (PAT) of ₹143.26 crore, as compared to ₹80 crore year-on-year (Y-o-Y), up 78.8 per cent. The company’s consolidated revenue from operations in the first quarter stood at ₹601.7 crore, as against ₹520.1 crore in the year-ago period.

HBL Engineering dividend record date

The company fixed Friday, September 12, 2025, as the record date for the determination of shareholders' eligibility for e-voting and to receive dividend, if declared by the members at the ensuing annual general meeting.
 
The board, at its meeting held on May 24, 2025, recommended a dividend of ₹1 per equity share of face value of ₹1 each fully paid up (i.e. 100 per cent) for the financial year ended March 31, 2025.
 
*Subscribe to Business Standard digital and get complimentary access to The New York Times

Smart Quarterly

₹900

3 Months

₹300/Month

SAVE 25%

Smart Essential

₹2,700

1 Year

₹225/Month

SAVE 46%
*Complimentary New York Times access for the 2nd year will be given after 12 months

Super Saver

₹3,900

2 Years

₹162/Month

Subscribe

Renews automatically, cancel anytime

Here’s what’s included in our digital subscription plans

Exclusive premium stories online

  • Over 30 premium stories daily, handpicked by our editors

Complimentary Access to The New York Times

  • News, Games, Cooking, Audio, Wirecutter & The Athletic

Business Standard Epaper

  • Digital replica of our daily newspaper — with options to read, save, and share

Curated Newsletters

  • Insights on markets, finance, politics, tech, and more delivered to your inbox

Market Analysis & Investment Insights

  • In-depth market analysis & insights with access to The Smart Investor

Archives

  • Repository of articles and publications dating back to 1997

Ad-free Reading

  • Uninterrupted reading experience with no advertisements

Seamless Access Across All Devices

  • Access Business Standard across devices — mobile, tablet, or PC, via web or app

More From This Section

Topics :Buzzing stocksMarkets Sensex NiftyMARKETS TODAYBSE SensexNSE NiftyNifty50

First Published: Aug 12 2025 | 10:43 AM IST

Next Story