This was achieved on March 21, when the PSLV Orbital Experimental Module-3 (POEM-3) met its "fiery end" through a re-entry into the Earth's atmosphere
News highlights: Catch all the news updates from around the world here
This is the third successful RLV launch mission conducted by the Isro and is estimated to have cost more than Rs 100 crore
He said he had realized that there were some health issues during the launch of the Chandrayaan-3 mission but was not very clear about it
Isro chief S Somnath stated that he has been entirely cured of cancer and has resumed his duties
The Gaganyaan mission is ambitious and indigenous. Shine Jacob explains the nuts and bolts in its planning
The BJP's birthday greeting comes amid a row over an advertisement for Isro's new launch complex in Tamil Nadu, which featured a 'Chinese flag'
This collaboration is aimed at transforming Urban Frame Survey (UFS) from analogue to digital mode and help MoSPI to achieve the targets of updating urban frame regularly in a timely manner
"Everything will be defined: What can be done, what restrictions there will be, authorization processes, vendor policy, supply chain management and other factors," Goenka said in an interview
Prime Minister Modi accused the DMK of putting its stamp on the BJP-led Centre's projects and trying to claim credit for them
Gaganyaan astronauts: All of the four pilots are aged between 39-48 years and have a flying experience in the range of nearly 2,000-3,000 hours
Valuations wise, most are trading at price to equity multiples of 50-100 times on a 12-month trailing basis, data from BSE shows. Apollo Micro Systems, for instance, commands a PE of 152 times
The space sector has opportunities for India
Modi bestowed the 'astronaut wings' to the astronaut-designates and also reviewed the progress of the Gaganyaan mission
The Prime Minister will also be reviewing the Gaganyaan human spaceflight programme during his visit to the Vikram Sarabhai Space Centre (VSSC) here
Isro has also successfully concluded acceptance tests for the flight engine designated for the first unmanned Gaganyaan (G1) mission
For the satellite INSAT-3DS, ATL has supplied complete power control system, solar array generation system, power distribution system, DC-DC power converters, star sensors
INSAT-3DS satellite aims to augment the study of the Earth's surface and oceanic observations
The mission is fully funded by the Ministry of Earth Sciences (MoES)
The lift-off for the GSLV-F14 in its 16th mission is scheduled at 5.35 pm on Saturday from the Satish Dhawan Space Centre in Sriharikota