Business Standard
Saturday, Nov 21, 2009
 
drived banner
drived banner
  Advanced Search
Feedback | RSS
Content Guide
Follow us on  
  Home  ||||||||| 
 BS Headlines | News Now | BS Weekend | The strategist | The Smart Investor | Lunch with BS | Columnists | BS 1000
  Hindi | E-Paper | Motoring  | Live Markets |  Smart Portfolios II  | Blogs | Portfolios >
  Search:

Sadanand Menon: Not floods but criminal design failure
CRITICALLY INCLINED
Sadanand Menon / New Delhi September 05, 2008, 0:14 IST

The jacketing or embanking of the river systems in north Bihar must go down as among the most ill-thought out schemes in Independent India.

 
 
News Now
Paper
Specials
- Sensex makes remarkable recovery, regains 17K
- Shubhalakshmi Panse takes charge as Vijaya Bank ED
- S C Kalia takes over as Union Bank ED
- PNB may acquire majority stake in Kazakh bank
- Maoist hindering land acquisition for Tata steel project: Raman
More  

I am talking about the so-called ‘floods’ in north Bihar. Many adjectives have been spun by political and media establishments over the past three weeks to describe the unprecedented inundation of 16 districts and displacement of close to five million people. It has been called a deluge, devastation and a ‘national calamity’. No one, however, has used the term ‘criminal design failure’ and sought to expose the culpability of political and technical establishments in the whole sordid affair.

No one has pointed out that it was a 50-year-old time-bomb waiting to explode. Even as the first of this modern-Indian project of embanking the Kosi began in 1955, it was clear that a recipe for disaster had been drawn up and that Bihar was due for a jala-samadhi sooner or later.

There is an attempt to treat the August 18 breach in the eastern embankment of Kosi at Kusaha, on the Indo-Nepal border, as some kind of a unique, one-off event. As if this was a ‘natural disaster’ due to unusually heavy rainfall in the Himalayan slopes from where the river originates. Worse, as if Nepal was to blame, as it allegedly reneged on its commitments to maintain and dredge the barrage and the embankments on its side of the border due its preoccupation with the political change of guard there.

No one has so much as whispered that the maintenance of the barrage and the embankments is the responsibility of the engineers of the Bihar Water Resources Department. Demonising Nepal is one of those convenient blame games the media likes to indulge in and it is not new, in the context of a drowning Bihar. In earlier years too such accusations have been made along with contradictory proposals to seek multi-national corporate investments to build and operate mega dams on the Nepal part of the river, particularly the Kosi High Dam at Barahkshetra.

From the time I travelled in these parts 20 years ago, studying the repeating annual cycle of water-logging, food or water famines, homelessness and epidemics in the 16 districts of north Bihar, it has been clear to me that there is a deep criminality in the planning, designing and execution of the river embankment projects of this region.

The basic story is about how the north to south flowing rivers in Bihar like the Mahananda, Kosi, Kamala, Dhousa, Adhwara, Bagmati, Burhi Gandak, Gandak and Ghaghra were subjected to systematic embanking since 1954. The initial intention was to contain the natural swing of these rivers as they gushed down from the foothills of Nepal to the plains of Bihar.

The plan was to introduce about 150 kilometres of embankment on the Kosi to protect a declared ‘flood prone’ area in the state of some 25 lakh hectares. Today, some 50 years later, north Bihar is a warren of over 3,500 kilometres of embankments, with the declared ‘flood prone’ area having crossed a staggering 75 lakh hectares. And this staggering debacle has been at the cost of over Rs 3, 000 crore.

The embankment debate had, in fact, begun in the late 19th century and there exist at least 70 years of records till the 1950s in which most expert opinion warns against pursuing the embankment route to tackle perennial overflowing or swing in a river’s temperament, as it would impede natural drainage. Kosi’s character was to rush down the hills with an immense load of top soil and spread it across the plains, enabling a bumper crop the next year.

The initial embankments, eight feet high, converted the Kosi bed into a catchment area for silt. As the first phase ended in1965, the river had risen four feet. The bund had to be raised further. This became a regular cycle. Today, Kosi flows a good 25 to 30 feet above ground level. Every time there is a threat of flooding, parts of the embankment are strategically dynamited to let the water out. This is what gets labelled the ‘flood’.

But this is a flood that cannot recede. The river basin is way above ground level and water cannot flow upwards. The inundated villages between as well as outside the embankments stay water-logged for months on end, leading to rise in soil salinity, water-borne diseases and producing hordes of migrant labour. Even before the current crisis in Bihar — for the past twenty-five years — at least 3.5 million people have been living in shacks atop the embankments, making rotis out of the seeds of a grass that grows on its slopes.

The embankment project is one of the greatest ‘design failures’ of our times. This is not the last we are going to hear of the floods. Bihar is destined to stay submerged for a long time.

Arrow Other Stories     
- Sensex makes remarkable recovery, regains 17K
- S C Kalia takes over as Union Bank ED
- PNB may acquire majority stake in Kazakh bank
- Maoist hindering land acquisition for Tata steel project: Raman
- Koda says he will report to ED only after Jharkhand polls
More  
  Read Business news in 
  Get financial advisory and solutions for your projects
  Holidays starting at a delightful EMI of Rs 3481
  Switch on and say hello to Monday morning !
  Your dream home can now be a reality.
  Visit Fortis for a preventive health check-up & get a 20% discount.
  Follow the ups and downs of your investments. Try our new Portfolio Tracker
  Kolkata Dock \ Freight contract for the British Gurkhas Nepal
  Find how Midsize Businesses use ERP to gain competitive advantage
  Trading in Forex is now as easy as 1-2-3
  Discover an economical and cost effective way to market your products and services
  Giftwithlove.com: Same day delivery of Flowers and Cakes to India
  Download the E-book on the Future of Business Intelligence
  Learn Best Practices for improving customer satisfaction
  Know your customers better... download the free e-book on CRM
   Discussion Board / User Comments    
Display Name  Email-Id  
Post your comment
Most Popular
Read
E-Mailed
Commented
   
- Bharti Airtel slashes roaming rates by 60%
- Govt may allow private sector investment in education
- Network18 lays off 200 staffers
- Suzlon Energy's three promoters pledge 2.8 cr shares
- Patni may host all IT services on 'cloud'
 
 More  
BS Poll
Cast Your Vote
 
   
 
Should India's defence sector be thrown open to foreign investments?
  Yes  No
Submit

  Hot Searches  
 
Amitabh Bachchan | N Chandrasekaran | Swine Flu | Mukesh Ambani | Anil Ambani | TCS | Infosys |  Air India |  Duronto |  Pranab Mukherjee | Sonia Gandhi | Congress | Rahul Gandhi |  Bigg Boss |  New Pension Scheme |  Service tax |  Excise duty |  Sebi | Tech Mahindra |  Ramalinga Raju |  Satyam |  Reliance  |  RBI |  GDP |  Gold |  Ratan Tata |  ICICI |  |  B-School | DLF  Sensex |  Tax calculator | Home Loan  | Bollywood | Personal Finance |  inflation | oil prices |  World Bank | Reliance Infratel |  HDFC |  Barack Obama  
  Member Area Write to the Editor RSS Archives Advanced Search
  Subscribe to BS print product BS e-paper Newsletter Portfolio Tracker
  BS Products BS Hindi BS Motoring
FOR HOT PRODUCTS
BS Bazaar.com
Home | Markets & Investing | Companies & Industry | Banking & Finance | Economy & Policy | Opinion
Life & Leisure | Management & Marketing | Tech World
About Us | Partner With Us | Code of Conduct | Careers | Advertise with us| Terms & Conditions | Disclaimer | Site Map | Contact Us | Feedback