BCL Industries receives I-REC certificates for its 10 MW captive power plant

For renewable power generated during Jan-Sep 2025
BCL Industries has been issued 50,077 International Renewable Energy Certificates (I-RECs) for the renewable power generated during the period January 2025 to September 2025 at its 10 MW captive power plant located at Bathinda, Punjab.
The power is generated using a 60 TPH biomass-fired boiler that utilizes paddy straw as the primary fuel. These certificates have been issued under the globally recognized I-REC Standard, administered by Evident Ev and facilitated in India through the International Carbon Exchange (ICX), a subsidiary of IEX.
Going forward, the Company shall continue to receive I-REC certificates on a pro-rata basis corresponding to the renewable power generation in subsequent periods.
Powered by Capital Market - Live News
Disclaimer: No Business Standard Journalist was involved in creation of this content
More From This Section
Don't miss the most important news and views of the day. Get them on our Telegram channel
First Published: Oct 14 2025 | 12:11 PM IST
