State-run power giant NTPC on Sunday said it has begun bulk supply of fly ash using newly developed infrastructure at its Rihand project in Uttar Pradesh to distant cement plants.
The development is in line with the NTPC's commitment towards 100 per cent utilisation of fly ash from power plants, the company said in a statement.
"NTPC Ltd has developed an infrastructure at Rihand project in Uttar Pradesh to transport fly ash in bulk to cement plants, located at distance, at a cheaper cost," a company statement said. The infrastructure includes dry ash extraction, loading, weighment systems and silo storage

)