Wednesday, December 17, 2025 | 12:27 AM ISTहिंदी में पढें
Business Standard
Notification Icon
userprofile IconSearch

WR to build 64 FOBs on suburban network, including 30 in 2019

Image

Press Trust of India Mumbai

Western Railway will build 64 foot overbridges over the next two years, 30 of which will be ready for use in 2019, a senior official said Friday.

He informed that WR had commissioned 19 FOBs in 2018 and four new ones would come up before the end of the current fiscal in March this year.

He said a greater number of FOBs on the suburban network would provide relief to commuters and also bring down instances of people trying to cross tracks to change platforms.

Plans to build FOBs in the metropolis gained momentum after a stampede on a narrow bridge connecting Parel and Elphinstone (now Prabhadevi) stations in September, 2017 killed 23 people.

 

A cave-in of a portion of a bridge at the southern end of Andheri station in July last year had killed five people, prompting Railway Minister Piyush Goyal to order an audit of all such structures on the suburban networks of WR and Central Railway.

Ravinder Bhakar, Chief Public Relations Officer of Western Railway, said meticulous planning and time bound execution was ensuring that FObs were being built at a fast rate across its network.

He informed that the Carriage Repair Workshop at Lower Parel had built a modified bridge inspection coach for speedy checking of these structures.

An order for an 8-wheel overhead inspection car had also been placed with the Dahod Workshop, he informed.

Disclaimer: No Business Standard Journalist was involved in creation of this content

Don't miss the most important news and views of the day. Get them on our Telegram channel

First Published: Jan 04 2019 | 3:15 PM IST

Explore News