Argues tax proceedings initiated after more than six years
Prime minister also announces measures to provide green clearances within 30 days
Continued pressure on interest margins and provisioning costs are the reasons
RBI has permitted exporters to receive long-term export advance to execute long-term supply contracts for export of goods
Petitioner fined Rs 1 lakh for filing a 'frivolous' case against Odisha CM in Talabira coal block allocation row
It will be designing and constructing a 417-km stretch of the project's eastern arm
According to the survey, when students listed their top five consideration criteria for actually selecting a programme and a study destination, rankings didn't rank
Essar is the leading coal bed methane producer in India
The results were delayed following the SC order that Jats should not be given reservation under the OBC quota
Ambika Soni, Sandeep Dikshit favour Sonia's continuation as party chief; Rahul camp wants a change
The contribution of CNG vehicles to total sales increased to 5.4% from 4.9% a year ago
The fall comes on the heel of two launches, Platina and CT100, in January and March, respectively
Proposals include trading halt, allowing OFS on Saturday
Recently, the government said it had decided to bring down its stake in PSBs to 52%
RBI has allowed banks additional time for classifying a restructured asset as non-performing by extending the DCCO by up to 2 yrs
On smart cities, says the proposal will come for Cabinet approval this month
Mid-sized firms (turnover of Rs 100-500 cr) saw biggest gain in credit quality
Sinha flagged the lack of proper infrastructure, advanced technology and trained manpower as the agency's weak points