The company has achieved 60 percent rise in shipment in last five years
Of the total, 1 MW of energy will be required for Surat Smart City
The amount of budgetary grant to the MNRE was Rs 1,977 crore in 2014-15
An investment of Rs 17,500 cr will be made
Only 3 have issued a schedule with targets, 6 months after Centre notified a set of recommendations
To achieve its targets, India must add 130.76 GW of renewable energy over the next six years
The company has placed an order with Ujaas Energy for purchase of 1.0 MW solar power generating system for this purpose
The company has awarded a contract to Inox Wind Limited for setting up the 50 MW wind power project in Gujarat
First compact plant worldwide for synthetic fuels from solar energy and carbon dioxide extracted from air to start in Finland
As per terms of the contract, Gamesa will supply 25 units of G114 - 2.0MW T106 turbines which will be set up at Amba, Madhya Pradesh
Two sides will develop a power management system to optimise the operation of multiple microgrids, with and without grid connection, while managing electricity supply to villages
The project, to be based in Gujarat, is scheduled to be commissioned by March 2017
Through this tie-up, Wheels India Ltd, a part of TVS Group, will manufacture hydraulic components for supply to wind mill manufacturers in India
The company, which becomes first cement firm to commit to 100% renewable electricity, is the third Indian business to join the RE100 initiative in after Infosys and Tata Motors
Renewable energy reached an important turning point last year with record new installations of emissions-free power surpassing sources
With this deal, Canadian Solar, which will acquire stakes in two solar projects of 15 MW each located in Telangana, will enter into Indian solar energy space
The unit at Badnawar (Ratlam) will manufacture rotor blades for its latest S111 2.1 MW turbines and have annual manufacturing capacity of 400 MW
May be made more stringent, renewable energy units fear this could mean higher costs
OPEX model, where a third party developer finances and installs the system on rooftop owner/consumer's premises and sells all power output to him, takes hold in India, says Bridge To India
If the benefits are available for a period of 25 years, government could have been a little more generous with the deadline