Business Standard
Friday, Jun 01, 2012
Sponsored by  
drived banner
drived banner
  Advanced Search
RSS
Content Guide
Follow us on  
||||Economy & Policy||||| 
 Section Home | News Now | Today's Paper | Features & Analysis | Politics & Public Affairs | Q&A | Columnists | BS Says
Home > Economy & Policy Live Markets | Commodities
 

Toxic water level increases in Japan's crippled N-plant
Press Trust of India / Tokyo/Fukushima Apr 26, 2011, 20:02 IST

The embattled operator of Japan's radiation-leaking Fukushima nuclear complex today said it is giving top priority to transferring "highly contaminated water" from the No. 2 reactor after toxic water level in two of the six reactors rose, hampering the critical work of restoring its cooling functions.

The Tokyo Electric Company, the operator of the troubled Fukushima Daiichi nuclear power plant, said it is giving top priority to transferring highly contaminated water from the No.2 reactor.

Radioactive water in reactor buildings and other areas of the plant is hampering work to bring the accident under control.

It said the radiation level in a tunnel at the No.2 reactor is "especially high, aTnd is transferring the water to a temporary storage site."

But, it has also found high levels of radioactive substances at the site of the No. 4 reactor. Last Thursday it detected 8,100 becquerels of cesium 137 and 7,800 becquerels of cesium 134 per cubic centimeter in the water in the turbine building's basement. The radioactive levels were about 250 times higher than a month before.

However, the power company said the water level in the tunnel of the No. 3 reactor rose to 99 centimetres below the surface last evening. That passes the level at which TEPCO plans to remove the water, but it is yet to secure storage space, national broadcaster NHK reported.

The water level in the basement of the No.3 reactor's turbine building also rose by 10 centimetres over 3 days, more than a month after a magnitude-9 quake and tsunami left nearly 30,000 people dead or unaccounted for in Japan's north east.

Earlier, a survey found an increase in the density of radioactive substances in the water in the basement of the No. 4 reactor's turbine building. The water level in the No. 4 reactor's turbine building rose by 20 centimetres in 10 days.

TEPCO said the levels of cesium-134 and 137 increased about 250-fold and iodine-131 increased about 12 times compared with the levels one month ago.

Contamination of this level requires the TEPCO workers to prioritise the transfer or disposal of the water.

TEPCO said the water being used to cool the No. 3 reactor could be leaking into No. 4 as their turbine buildings are connected.

Meanwhile, a government advisory panel said the reconstruction of towns and cities devastated by last month's quake and tsunami could take a decade.

Jun Lio of Japan's Reconstruction Design Council said the first three years would be needed for tasks like rebuilding roads and constructing temporary housing.

Another four years may be necessary to rebuild towns.

New Ipad Application :Business Standard's all new IPad App
Click here to download for free
Arrow Other Stories     
- Markets post worst May performace since 2006
- US jobs data points to recovery losing momentum
- FII-TO-FII TRADES: PNB traded at 5% premium
- Sugar output up at 25.5 million tonne this year surpasses govt estimate
- CoalMin identifies 54 blocks for allocation through auction
  Read Business news in 
- Help a Child Achieve her. Click to know more
- Benefits Upto Rs. 2.36 Lakhs on the Fully Loaded TJet Petrol.
- Watch The Film Here. Click here to know more..
- 1 billion in saving for Unilever without any tangles.
- One Partnership Endless Possibilities. Click here to know more
- Which is the best plan for your daughter
- Check out the TRUE COLOURS of your Stocks, Now for FREE!
- One of the leading business schools in the world.Know More
Sorry, comments to this story are closed
Latest Messages
Table for Two
  Now available at Special price
  Rs.280/- Only

  Buy Now
BS POLL
UPA 2 has completed three years. How do you rate its performance?  Read the story
  Good
  Average
  Bad
Submit
Most Popular
Read
E-Mailed
Commented
   
- Slowdown gets worse, GDP growth sinks to 9-year low
- M&M has a Rs 7,500-cr spending plan over three years
- India Inc ready to shift to other side of the dot on www
- India to be $2-trn economy by FY13-end?
- IIT alumni to move court on changes in JEE
 
 More  
New Ipad Application
 Business Standard's all new IPad  App
 Click here to download for free
  Hot Searches  
 
Apalya |  Air India |  GAAR |  Agni  |  Solar eclipse |  Satyamev Jayate |  SRK |  Aamir Khan |  IPL |  Ertiga |  Sarfaesi Act |  Vodafone |  JP Morgan |  Transfer pricing |  Rupee |  Kingfisher Airlines |  Silver |  Provident Fund |  income tax refund |  iPhone |  Reliance Industries |  SEBI |  BSNL |  BSE |  NSE |  Mukesh Ambani |  Anil Ambani |  Infosys |  Pranab Mukherjee |  Sonia Gandhi |  Rahul Gandhi |  New Pension Scheme |  Reliance |  RBI |  GDP |  Gold |  Ratan Tata |  ICICI |  B-School |  Sensex |  Tax calculator |  Home Loan |  Personal Finance |  inflation |  oil prices |  Barack Obama |   
 
  Member Area Write to the Editor RSS Archives Advanced Search
  Subscribe to BS print product BS e-paper Newsletter Portfolio Tracker
  BS Products BS Hindi BS Motoring BS Books
Home | Markets & Investing | Companies & Industry | Banking & Finance | Economy & Policy | Opinion
Life & Leisure | Management & Marketing | Tech World | General News
About Us | Partner With Us | Code of Conduct | Careers | Advertise with us| Terms & Conditions | Disclaimer | Contact Us