"This is a war, and the enemy is Himalayan geology," National Disaster Management Authority member Syed Ata Hasnain told reporters earlier this week
Auger parts being pulled out to rescue 41 tunnel workers
Catch all the latest LIVE updates from across the globe here
Earlier today, the plasma cutter arrived and began cutting the machine stuck in the pipeline
Earlier, on Sunday, a plasma-cutting machine was flown to the tunnel site from Hyderabad to cut through the Auger drilling machine and its stuck blades from inside the tunnel
A BSNL official, said they are in the process of sending a small landline phone to the stranded workers through the pipe. "Through this, they will be able to talk directly to their families," he said
"The auger will move extremely carefully," Hasnain said
The rescue team has placed broad pipes up to a depth of 45 metres through the debris
The ongoing rescue work entered its 13th day on Friday, with the trapped workers deemed safe and in good spirits
From 22 metres, the pipe had reached 45 metres till Wednesday night, but the auger machine had to temporarily halt operations after an iron girder was encountered by authorities at the site
Catch all the latest updates from across the globe here
An iron mesh that came in the path of the drilling machine creating an escape passage for the workers trapped in the Silkyara tunnel was removed on Thursday morning but has delayed the rescue operation by 12 to 14 hours, a senior official said. Former advisor to the prime minister's office Bhaskar Khulbe said removing the mesh in a claustrophobic environment inside the pipe was difficult. "It took us six hours to remove it. But the good news is that we have cleared the hurdle which came yesterday after drilling up to 45 metres had been done," Khulbe told reporters. Now the process of assembling to go beyond 45 metres which requires welding the pipes has been restarted. The drilling will also resume soon, he said. It will take around 12 to 14 hours more to complete the whole operation of reaching the workers. After that, it will take three more hours to take out the workers one by one. That will be done with the help of NDRF, Khulbe said. Union Minister of State for Road Transport
A fire broke out in a 24-storey residential building in Mumbai on Thursday following which at least 135 people were safely rescued from there, civic officials said. The blaze erupted at 3.40 am on the third floor of the building located in New Hind Mill Compound at MHADA colony in Ghodapdeo area where government has given flats to people, mainly mill workers, they said. The fire was confined to the electric meter cabin, wiring, cable, scrap material in the electric duct, garbage and material in garbage duct from 1st to 24th floor of the building, a civic official said. He said at least 135 people were safely rescued from different floors of the building. Out of them, 25 were evacuated from the terrace, 30 from a refuge area on the 15th floor, and 80 people from a refuge area on the 22nd floor of the building, he said. Five fire engines and three water tankers along with other fire brigade vehicles were rushed to the spot after receiving the call and the blaze was doused by 7.20 am
The workers have been trapped since November 12 when the under-construction tunnel from Silkyara to Barkot got blocked due to debris falling in a 60-meter stretch on the Silkyara side
Catch all the latest LIVE updates from across the globe here
CM Dhami further said that the way the video has shown that all the workers are safe we hope that all of them are rescued soon and for that, all efforts are being made
Prime Minister Narendra Modi spoke to Uttarakhand Chief Minister Pushkar Singh Dhami on Tuesday, the second day in a row, to enquire about the operation to rescue the 41 workers trapped inside Uttarkashi's Silkyara tunnel for 10 days. In a post on X, Dhami said he told Modi that the workers are safe and the prime minister underlined that the rescue mission is the topmost priority. This is the fourth time that Modi spoke to Dhami to take stock of the rescue operation since the tunnel collapse on November 12. He spoke to Dhami on Monday as well. In his post, Dhami said Prime Minister Modi called again today and enquired about the operation being carried out to rescue the workers trapped inside the under-construction Silkyara tunnel in Uttarkashi. He said he informed the prime minister about the successful insertion of a 6-inch pipeline through the rubble which will be used for providing food in larger quantities and other necessary items to the workers. "Honourable prime minister wa
The traffic has come to a halt on both sides of the main road
Speaking to ANI, from the site of the tunnel Professor Dix said the rescuers have several options to bring home the workers
The trapped workers were smiling in the video and stable state of mind. The workers were provided with a walkie-talkie through a 6-inch pipeline so that they could communicate with the rescue team